Well, i think we've made it through the busiest chunk of life for the next while...right now I am just sitting at home (by myself on family day, sigh), waiting for the energuide home evaluation guy to arrive.
Our first assessment was in Fall 2005, and we had about 16 months to do all the upgrades we wanted to get done to make the house more energy efficient. We did the furnace right away that fall, and then made plans to do a few other things, most of which have happened in the past two weeks, along with some other renovations.
The biggest thing we got done was new windows throughout the house (well, except for the one the store forgot to order, the one that hadn't come in yet, and the one that the store ordered the wrong window for, but those are another story altogether). Now, i didn't realize that it would be such a huge ordeal to do the windows, but part of that was due to the rushed timeline. We only had two days' notice that the windows were going in last week, so aside from the rush to rearrange work schedules so that one of us could be here, we also had to pull down all the window coverings and the trim from around the windows so that we were ready for the install.
The install went great, it was a 1 1/2 day process, and the new windows look (and feel) wonderful - we have no more drafts coming in! But changing from single pane aluminum sliders (basically metal on metal with no seal against the wind) to pvc dual pane low-e argon yadda yadda will do that. It is nice not to have a breeze over my head while i try to sleep, let me tell you that.
However, once they were done the work, i wasn't quite prepared for the amount of cleaning I would have to do - EVERYTHING in the house was covered with a fine layer of dust due to the cutting they had to do in the plaster walls in order to get the windows fitting properly. So it was about a 5-6 hour job to wipe down everything to get that dust off, and it still seems that everywhere i look, i need to go wipe again, as the dust is still in the circulation system of the house...yes, i think it's time for a new furnace filter.
Then alongside the window renos, we (meaning Anthony, for the most part) have been ripping apart our upstairs bathroom...it was very dated, with green tub and toilet, and nasty wall tiles, and no shower, so we decided to treat ourselves to a new bathroom with a soaker tub and a shower before this kid arrives. He's been doing a great job, mostly working in the evenings and on weekends when we have been home, and at this point, we are just waiting for the new tub to arrive next week, and still need to pick out the floor tiles, and then the re-assembly can start.
We have had some surprises, though, in dismantling the bathroom, mainly due to the age of the house. First of all, when removing the tiles, the walls were ending up in REALLY bad shape, as they were plaster walls (not gyproc), so we made a decision to put up all new gyproc in the bathroom - it would be impossible to patch the plaster, and really, plaster is not that great in a moist environment anyways. So the walls came down. That's when we discovered that on plaster walls, every corner (vertical, and where the wall meets the ceiling) is reinforced with a wire mesh, so you can't just take down one wall and leave the ceiling intact, as a good six inches of the ceiling is meshed into the top of the wall.
So, the ceiling started coming down. And that is when we discovered that our attic has wood chip insulation. Oooooh, fun! and MESSY. So we have currently left as much of the ceiling intact as possible until we can find a good way take it down without disturbing ALL the insulation...we'll see how that goes. We do have a couple options that contractor friends of ours have suggested, we just need to find the time to do it.
And one of the reasons that's been put on hold is because of the insulation and vapor barrier we found on the outside wall when the tub came out - it was old, first generation fibreglass insulation, and it was charcoal gray. Yup, no pink stuff in this house! And the vapor barrier was not plastic, it was some sort of papery substance - imagine thick, heavy brown packing paper that has some sort of waxy substance coating both sides. So needless to say, that whole wall was stripped down to the outside layer of plywood, and new insulation and vapor barrier went under the new gyproc.
Back to the energuide evaluation - all of this work on the outer wall (which we did not anticipate having to do) had to get done by today so that it would not impact our home efficiency rating for the energuide rebate.
So today, on Saskatchewan's first Family Day stat holiday, i spent the day (alone, tony had to work) putting up the last couple pieces of drywall around the window (the old one, since this is the room for which the salesman forgot to order the new window) and to cover the 6" gap between the ceiling we had not yet torn down and the part that had to come down when the wall was replaced. It went very well, though, and i feel like quite the handywoman!
But i think the guy is here now...gotta go!